| The trailer loaded up |
|
Leaving TRS in East Syracuse |
 |
|
 |
| On the road |
|
Arriving at Meachem Field |
 |
|
 |
| .Measuring for the sculpture feet locations |
|
.Preparing to lift |
 |
|
 |
| Lifting the sculpure out of the trailer |
|
The Lift |
 |
|
 |
| Moving the sculpture |
|
Setting it down |
 |
|

|
| In place ready to mark the bolt hole locations |
|
Marking the bolt hole locations |
 |
|
|
| .TMovMoving the sculpture off the base |
|
.Drilling the starter holes |
|
|
|
| .Drilling the holes for the anchor bolts |
|
.Placing the threaded rods to test the height |
|
. |
|
| A leaf blower blows out concrete dust from the bolt holes |
|
Blowing out the last of the concrete dust with a tube |
|
|
|
| Filling the holes with epoxy & setting the anchor bolts |
|
Lowering the sculpture on the rubber pads and bolts |