Group 3 - looking
toward hospital |
Group 3 - detail at bases |
Group 3 - end view -
play area at left |
|
|
|
Group 3
detail |
View from hospital
Group 2 & 3 (red arrows left to right) |
View from hospital
Group 1 approximate sculpture location |
|
|
|
Waterjet cutting an aluminum tree |
Detail of cut aluminum tree |
First cut aluminum trees |
|
|
|
Form for concrete footing tops
for group 1 |
Forms for footing tops for
groups 2 & 3 |
Footing reinforcing cages ready
on the truck |
|
|
|
The painting room at Ad Display |
Jonathan, Luey and Gary of Ad
Display
discussing the installation |
The Ad Display crew with Jessica
McBride of American Art Resources at the site |
|
. |
|
|
progress photos below of footing
installation and metal tree elements
are by Ad Display |
dated installation
photos above
are by Ad Display |
|
|
|
Drilling the holes for the
concrete footing and base for the Group 2 tree sculptures |
Drilling for the Group
2 tree footings - note the positioning template on the right |
The drill in action for the
Group 3 trees - bringing out the dirt |
|
|
|
Hole for the footings of Group 2
- note the wider top for the sculpture base |
Leveling the forms for the
concrete base at the top of the footings for Group 2 |
Reinforcing rods in
the footings of the
Group 1 trees - ready for the concrete pour |
|
|
|
Finishing the concrete for the
bases of the Group 1 trees |
Finishing the concrete for the
bases of the Group 3 trees |
The completed concrete footings
and bases for the Group 2 trees |
|
|
|
Aluminum trees with reinforcing
plates welded to trunk |
Base plate with stiffening
plates welded in place |
All the aluminum trees have now
been cut with the waterjet |
|
|
|
Trees welded to base plates |
Welding on the base plate at Ad
Design |
8 foot tall tree welded to base |
|
|
|
Preping for the painting |
Priming in the paint room |
The painting begins |
|
|
|
Group 1 - view from hospital |
Group
2 - view from
hospital |
Group
3 - view from
hospital |